Rayde Office Services

Accredited Non-Immediate Technical Report Issuance

Accredited non-immediate technical report issued through a licensed engineering office registered on the Salama portal, for activities and facilities in the non-immediate track according to activity and area, linked to the license request through Balady and Salama.

Contact us +966500004998

What Is the Non-Immediate Technical Report?

The non-immediate technical report (also called a non-immediate safety report) is an accredited engineering safety report used in the non-immediate track on the Salama portal, required for larger facilities or higher-risk activities, and one of the requirements to issue or renew a Civil Defense license linked to Balady.

Rayde Office issues the report as a licensed engineering office registered on the Salama portal, in line with Civil Defense requirements and the Balady integration requirements. For the technical report number and the general path, see the accredited safety technical report page.

When Does the Non-Immediate Track Apply, and When Is the Report Required?

The non-immediate track applies, and the report is required, when:

  • The activity is classified in the higher-risk or non-immediate activities on Salama.
  • The area exceeds the limit for the immediate track.
  • The request needs extra procedures compared with the immediate track, including a Civil Defense field inspection.
  • Renewing the Civil Defense license of larger facilities through the Balady – Salama path.

The track is set automatically on the Salama portal from the activity and area data, and it cannot be changed except as the system decides.

تقرير فني غير فوري
انظمة الحماية من الحريق co2

Link Between the Non-Immediate Technical Report and Balady

The technical report for Balady license renewal is part of the renewal path, where:

  • The report is linked to the license renewal request on Balady.
  • The report is a core requirement to complete the procedure.
  • Balady and Salama exchange data systematically.

For the renewal procedure itself, see the Civil Defense license renewal page; to issue the license for the first time, see the Civil Defense license page.

Difference Between the Non-Immediate and Immediate Tracks

The system sets the track from the activity classification and area. The immediate track is for lower-risk activities, usually without a Civil Defense field inspection; the non-immediate track is for higher-risk or larger facilities that need an inspection and extra procedures. The office cannot change the track; we review your activity and area and confirm the track before you apply. To compare, see the immediate technical report.

What Does the Non-Immediate Technical Report Service Include?

  • Review of the activity and area, and confirmation of the non-immediate track.
  • Coordination of the technical site inspection when needed.
  • Check that fire prevention and protection requirements are met.
  • Preparation of an engineering report matching the non-immediate track.
  • Approval of the report and official upload on the Salama portal.
  • Linking the report to the license renewal request linked to Balady.

Non-Immediate Track Requirements

  • Building permit.
  • Municipal license or municipal referral.
  • Lease agreement or property deed.
  • Active maintenance contract.

Common Causes of Delay in the Non-Immediate Track

The most common causes of delay in issuing the non-immediate report:

  • Technical site readiness.
  • Open safety observations.
  • Delay in linking Balady and Salama.
  • A missing document or an inactive maintenance contract.
عقود صيانة السلامة

Who Is Authorized to Issue the Non-Immediate Technical Report?

A licensed engineering office registered on the Salama portal, licensed by Civil Defense and legally responsible for the accuracy of the technical data. Rayde Office issues non-immediate technical reports for covered facilities in line with Salama and Balady requirements.

Why Rayde Office?

Rayde Office for Fire Protection and Safety Engineering is a Saudi firm founded in 2016 by Eng. Saleh Mohammed Al-Baraka, a retired Civil Defense major general with more than 40 years of experience in fire safety and protection.

  • Integrated engineering services: technical evaluation, design, approval of plans with the authorities, operation and testing.
  • Work in line with Civil Defense requirements, the Saudi Building Code (SBC), IBC and NFPA.
تقرير سلامة هندسي

Accredited By

  • Civil Defense
  • General Commission for Industrial Security
  • Saudi Council of Engineers
  • MODON (Saudi Authority for Industrial Cities)
  • Secretariats
  • Municipalities

Services Related to the Non-Immediate Technical Report

Request a Non-Immediate Technical Report (Balady – Salama Path)

If you are renewing your Civil Defense license through Balady and need an accredited engineering office to issue a non-immediate technical report, Rayde’s team can review your case, confirm the non-immediate track requirements and issue the accredited report.

FAQ

Yes, it is often used in the Civil Defense license renewal path linked to Balady for facilities and activities in the non-immediate track.

In most cases yes, as a field inspection may be part of the non-immediate track requirements; the engineering team decides after reviewing the activity and area.

The time depends on site readiness, completeness of requirements and safety observations, and is usually longer than the immediate track.

Common causes are technical site readiness, open safety observations, delays in linking Balady and Salama, or a missing document.

The immediate track is for lower-risk activities, usually without a field inspection; the non-immediate track is for higher-risk or larger facilities that need an inspection and extra procedures. The system sets the track from the activity and area. See the immediate technical report.

The system sets the track from the activity classification and area, and the office cannot change it. Send us your activity and area and we will confirm the track before you apply.

We Are Pleased to Serve You in Safer Buildings

We will contact you as soon as possible, or call us now.

with-type-flattened-en - Copy

Rayde for Fire Protection Engineering Consultations is a certified company by Civil Defense and several government entities. It works on finding integrated, effective, and innovative engineering solutions and establishing strategic partnerships for fire protection and prevention.

Subscribe Now

Approving civil defense plans Designing safety plans, issuing safety licenses, approved safety report, engineering consulting office, designing and approving a safety plan, issuing a technical report.